Amir’s Solar Installation in Studio City

Project Description

Background

Amir originally reached us through Yelp. His assistant scheduled a meeting with one of our project manager to come and inspect the roof of the building. This is the building where Amir and is co-workers work, it is located in West Covina, and the main reason for the inspection was the recent leaks they experienced. Our roofer presented Amir his conclusions and suggest several different approaches to the leak. Amir who wanted the problem solved, decided to go with our roofer’s recommendation of simple adding another silicon coating to extend the roof’s lifespan and provide an extra layer of protection against the leak, work was completed within a day. Amir was extremely satisfied with NRG Upgrade and our team, he mentioned we were honest, quick and efficient. Evidently he reached out to us again when he was ready to have solar panels installed in one of his properties. The beautiful resident, located in Studio City was recently purchased by Amir and his wife. The property is located right on hill which give the house an incredible view of the city. The roof is flat and is exposed to sunlight throughout all the hours of the day because of the unique placement of the house. Amir and his wife felt there are too many reasons to install solar panels and they are ready to proceed with the installation as soon as possible.

Process

Since Amir was very satisfied with his previous project manager he reached out to him directly for this project, thus, Asaf was eager to move forward and scheduled Amir’s project for the following week. Meantime we extracted permits from both the utility company, in this case LADWP and the city permit for the solar installation. Asaf presented Amir and his wife with several different brands fro the solar equipment, they chose the LG 330 panels. We completed the installation within 2 days of work and the final inspection was scheduled for the next day, inspection was approved.

Outcomes

The last remaining step was the PTO, permission to operate which represents the final straw when installation solar panels on one’s roof. This approval is given by the utility company, once all documents are submitted, and city approval is granted. Amir’s project went quickly and smoothly, PTO was granted within 4 days of the final inspection and Amir and his wife couldn’t be happier. We are honored and grateful that they chose to work with us again and look forward to assisting them in future projects.

Properties:

Address: Studio CIty Los Angeles California

Job Type: Solar Installation

Materials:  LG Panels, Solar Edge Inverter and Optimizers.

Remarks: nothing makes us happier than returning clients it is the ultimate factor for success within NRG Upgrade

 

Project Gallery

solar-system-studio-city-lg-panels-flat-roof
flat-roof-studio-city-solar-system-lg-panels
studio-city-lg-panels-solar-system-flat-roof
solar-system-lg-panels-studio-city-flat-roof
solar-system-lg-panels-studio-city-flat-roof
lg-panels-flat-roof-studio-city-solar-system
solar-system-lg-panels-studio-city-flat-roof
lg-panels-studio-city-solar-system-flat-roof
solar-system-lg-panels-studio-city-flat-roof
navigate_before
navigate_next

Recent Projects

Roof Replacement for Greg in Pasadena

Background Greg reached us through Yelp. He had a leak in his laundry room and w

Alex’s Solar and Battery Installation in Hollywood Hills

Background Alex reached out to us through a mutual friend Ariel, he was interest

Suzan’s Roof and Solar Project in West Hills

Suzan reached us through Yelp, as she was looking to do a full roof replacement

Comments

Location

Studio City, Los Angeles, CA, USA

Project Categories

Solar Installation

Project Tags

Flat roof
LG panels
Solar system
Studio city

Contact Us